The Challenge

Process Development of New Front Wall and Dash System - Heavy Duty Truck Manufacturer

Design Systems, Inc. (DSI) designed a process to assemble the new front wall and dash system for a large domestic truck manufacturer. DSI’s manufacturing group determined the most cost effective assembly method by building a model of the process utilizing prototype material to mock production of the new system. The goal of the project was to increase productivity and operation performance through design and management of operators for the new process.

The Solution
  • Perform time study to establish the required number of workstations, operators, and labor hours.
  • Develop process flow diagram of prototype.
  • Perform a Design For Manufacturing and Assembly (DFMA) Analysis of truck dashboard
  • Provide AutoCAD drawings of assembly line and station layout
  • Complete process sheets and task assembly instructions
  • Perform a Failure Modes and Effects Analysis (FMEA) of the assembly of the prototype
The DSI Difference
  • Created a Bill of Material for the front wall assembly
  • Determined that 9 assembly stations, 1 test and repair station, 10 operators and 1 “floater” are needed for the process
  • Established tooling requirements with necessary documentation for workstations
  • Developed a CAD layout of the process to determine the placement of materials and allocation of space
  • Recommended improvements of ergonomics, line-side communization issues, and assembly concerns to optimize the process
Markets
  • Manufacturing & Industrial
Capabilities
  • Supply Chain
  • Engineering
Industries
  • Motor Vehicles
Downloads
Gallery

How Can We Help Your Company?

I am looking for
solutions in the
industry and need help with